We spent 3 weeks at this property renovating our customers kitchen as we carried out extra building work such as; removing a studied wall and opening the area, fitting a new external stop tap as well as electrical and plaster work. finally we also carried out the complete wall and floor tiling. We maximised the storage with the space provided as well as fitting the latest appliances such as an down-draft extractor fan, installed within the breakfast bar. We worked together with our customer to design this stunning kitchen, who is over the moon with the results.