A three-week kitchen renovation, wall to wall
Three weeks, and very little of the original room left by the end.
- Room
- Kitchen
- Scope
- Designed, supplied & fitted
- Completed

The brief
This was a full renovation rather than a replacement kitchen. Getting the design the customer wanted meant taking a wall out and rebuilding the room around the new layout.
What we did
- Removed the wall and opened the two spaces into one
- Carried out the building work, electrical first fix and plastering
- Fitted the kitchen units, worktops and appliances, including the gas hob and extraction
- Completed the wall and floor tiling throughout
The result
Our team spent three weeks on this renovation and addressed every detail along the way. The gallery follows the job in order, from the wall coming out to the finished kitchen.